Completed
-
Winkler – Mountain Ave Sewer Trunk Expansion
The construction of 334m of 375mm sewer trunk along Mountain Avenue between 1st Street and 4th Street with […]
-
MTS City of Steinbach Project
Fiber to the home
-
MTS City of Dauphin Project
Fiber to the home
-
Rm of Springfield Dugald – Water contract one
9000m of 250 dia. Raw water Pipe (Directionally Bored), including highway crossing, Gate valves and interconnections to existing […]
-
Leaf Rapids Ruttan – Mine Site Remediation – Earthworks job
Excavation and Placement of Clay – TMA 3 Clay Cut-off (2000m3) , Supply and Placement of Geotextile SCS […]
-
RM of St Andrews – Phase 2
7000m of 300mm forcemain, includes connections to existing forcemain and lift station.
-
Yorkton – Sewer System Upgrades
Complete upgrades to approximately 1,365 m of existing storm drainage ditch and the installation of approximately 1,325 m […]
-
CN – Watermain Design Build
240m of 200mm C900 watermain with crossing 1350 aqua duct, a 1050 force main and 48m of 14” […]
-
Landmark
4,365m of HDPE Watermain ranging in size from 25mm-300mm. Including 46 Service connections, 62 Fire hydrants and associated […]
-
Rm of St Andrews – Phase 1 Contract 1
Supply & Installation of approx. 28,000m of low pressure sewer main, 7,000m of service pipe and associated works […]
-
Neepawa PTH 5
Supply & Installation of approximately 2,100m of 300mm, 250mm, 150mm, and 100mm water supply pipeline, water service connections […]
-
Birtle – Raw Water
Sub for Russell Reddy Mix, 1370m of 200mm HDPE DR11 pressure pipeline, Including crossings.