Completed
-
Newton River Crossing – City of Winnipeg
Accurate HD facilitated the construction of a new, 466 meter river crossing installed trenchlessly 40 meters below grade […]
-
Regina Bay and Windigo Island WTP
Regina Bay and Windigo Island Project is for the Animakee Wa Zhing First Nation on Lake of the […]
-
MTS City of Steinbach Project
Fiber to the home
-
MTS City of Dauphin Project
Fiber to the home
-
Rm of Springfield Dugald – Water contract one
9000m of 250 dia. Raw water Pipe (Directionally Bored), including highway crossing, Gate valves and interconnections to existing […]
-
Leaf Rapids Ruttan – Mine Site Remediation – Earthworks job
Excavation and Placement of Clay – TMA 3 Clay Cut-off (2000m3) , Supply and Placement of Geotextile SCS […]
-
Brandon Kirkcaldy – Forcemain
The construction of new watermain crossing of the Assiniboine River, complete with tie-ins to the existing watermain, abandonment […]
-
Riel Station
The removal and replacement of fire hydrants for Riel Station. Hydro-excavation was used to expose the valves and […]
-
Small Jobs
A variety of short-term work, ranging from one day to a week.
-
MTS
Work as an ongoing project with various locations in Manitoba, during the height of the season we have […]
-
RM of St Andrews – Phase 2
7000m of 300mm forcemain, includes connections to existing forcemain and lift station.
-
Yorkton – Sewer System Upgrades
Complete upgrades to approximately 1,365 m of existing storm drainage ditch and the installation of approximately 1,325 m […]