Projects
-

Gillam – Sewer and Water Renewal
Project was installed via open cut – 1600m of pre insulated HDPE watermain 800m of Dual pre insulated […]
-

Dauphin – South Main St Sewer
735m of 200-450mm Gravity Sewer, 460m of 300mm Forcemain and Lift Station.
-

Aurora Phase 1
Commercial sub-division of 6000m of water, sanitary, and storm sewer from 150-1850mm, manholes, hydrants, fixtures. Completed 1 month […]
-

Town of Elie – Watermain Renewal
The replacement of approximately 1,000m of 150mm cast iron watermain with 150mm HDPE watermain, 64 curb stops, and […]
-

Rm of Kelsey Ralls – Island Water Pipeline
64,000 M of HDPE water line ranging from 38-150 mm. including multiple road and environmental crossings installed via […]
-

GTH – East Side Underground
Industrial Sub Division water and sewer servicing 4500lm, 250-300mm installed via HDD and Open Cut.
-

Portage – Water Supply Phase 1
The construction of approximately 900 metres of new 300 mm water supply main and associated works for road […]
-

Thompson – Watermain Renewal
Supply and Installation of new watermain at Cree Rd from Burnt wood Rd to Thomson Dr S, Cree […]