Project Description
Regina Bay and Windigo Island Project is for the Animakee Wa Zhing First Nation on Lake of the Woods to replace the Existing WTP’s and the existing distribution system. This includes new lake intakes and discharge lines, lake crossings and dry hydrants feed by the lake. A majority of this work is to be installed through bed rock, including drilling through bed rock to install the intakes and the lake crossings.
Project Details
Categories | |
Client | Animakee Wa Zhing First Nation |
Location | Lake of the Woods |