Rm of West St Paul’s – Main St Trunk Sewer – Contract 3
The Challenges
Supply and installation of approximately 950 metres of 250 mm diameter and 300 mm diameter wastewater sewer, manholes and associated works; Supply and installation of approximately 1,400 metres of 100 mm and 200 mm diameter wastewater forcemain and associated works; and Supply and installation of two (2) pre-fabricated fibreglass wastewater lift stations and associated works.