  • Small Jobs

    A variety of short-term work, ranging from one day to a week.

  • MTS

    Work as an ongoing project with various locations in Manitoba, during the height of the season we have […]

  • RM of St Andrews – Phase 2

    7000m of 300mm forcemain, includes connections to existing forcemain and lift station.

  • Yorkton – Sewer System Upgrades

    Complete upgrades to approximately 1,365 m of existing storm drainage ditch and the installation of approximately 1,325 m […]

  • CN – Watermain Design Build

    240m of 200mm C900 watermain with crossing 1350 aqua duct,  a 1050 force main and 48m of 14” […]

  • Landmark

    4,365m of HDPE Watermain ranging in size from 25mm-300mm. Including 46 Service connections, 62 Fire hydrants and associated […]

  • Rm of St Andrews – Phase 1 Contract 1

    Supply & Installation of approx. 28,000m of low pressure sewer main, 7,000m of service pipe and associated works […]

  • Neepawa PTH 5

    Supply & Installation of approximately 2,100m of 300mm, 250mm, 150mm, and 100mm water supply pipeline, water service connections […]

  • Birtle – Raw Water

    Sub for Russell Reddy Mix, 1370m of 200mm HDPE DR11 pressure pipeline, Including crossings.

  • Thompson – Water & Sewer Renewal

    Water main & Sanitary sewer main installation on Brandon Crescent and Staghorn. Water main installation on Thomspon Drive, […]

  • Vale Thompson – Potable Waterline

    Supply & Install 3400m o 250mm HDPE, includes valves and hydrants.

  • Gillam – Sewer and Water Renewal

    Project was installed via open cut – 1600m of pre insulated HDPE watermain 800m of Dual pre insulated […]